Most Common Challenges In Material Management In The Construction Sector

Most-Common-Challenges-In-Material-Management-In-The-Construction-Sector

Problems with material management are one of the most frequent difficulties people encounter in the construction sector. Poor material management can cause issues with your project’s overall time frame.

The facility owner, engineering firm, and construction management contractor may all have different ideas about how building projects should be handled. In contrast, all parties generally concur that the project’s primary objective in project material management is to guarantee that the materials are ordered and delivered to the construction site on time to prevent construction delays.

If this isn’t done appropriately, there may be specific frequent difficulties and pitfalls that could cause significant delays. If you encounter problems while working on your construction project, material delays might also increase project expenses and schedule impacts.

However, you can attain the perks of material management only if you have experienced construction contractors on board.

Here are some of the most frequent material management problems and some advice on how to solve them.

Procuring Bids

A project’s scope frequently changes as it is being put together, which could impact the bidding process. An excellent illustration of this would be if the project’s owner decided to switch to higher-quality materials without altering the project’s overall budget. Usually, the general contractor will consent to this and then determine what modifications can be made and how to make them in collaboration with their specialised on-site contractors.

By keeping all of the contractors informed and involved throughout the process, this problem may be avoided. This issue can be avoided by hiring every contractor up front. The contractors can all give the owner more accurate estimates of costs and completion dates. They can also assist the general contractor in determining what modifications to the project can be made to accommodate the changes the owner requests.

Lack Of Planning

All things in the planning phase will result in challenging building issues. The following are the critical planning problems that directly result in poor construction material management:

  • Incorrect or faulty construction sequencing that results in the assignment of incorrect milestones
  • Engineering deliverable submittal dates that are out of line with the overall delivery timetable
  • The engineering, procurement, quality, and construction strategies for the project need to be interconnected and integrated

The project team should undertake planning tasks thoroughly, keeping in mind the interfaces between all project phases and areas, to address these problems. Setting delivery targets and acceptance standards will enable engineering and procurement activities to be coordinated and procurement activities to be coordinated with successful material management.

Also read: How To Optimize And Improve Material Management Inventory In Construction

Incoherent Project Organization and Communication

A pillar for having efficient project material management in addition to planning is establishing healthy project communication management, team organization, and integration. This allows project stakeholders and various parties to convey plans effectively. In general, poor organization and communication can result in:

  • Poor coordination of efforts between engineering and procurement on one side and procurement and construction on the other resulting from failure to establish clear communication routes.
  • Team members lack of ownership and responsibility will lead to a mismatch of expectations and hinder them from concentrating on the goals of the material delivery process.
  • Delays in important activities involving the acquisition of materials are caused by hesitation in making decisions and securing the necessary clearances.

To avoid construction from suffering later due to poor material management, the engineering team must take the following steps:

  • Ensure the bill of quantities is precise as inaccuracies could result in material shortages or waste.
  • Make sure material parameters meet design standards.
  • Design as much as feasible with off-site construction or prefabrication in mind.
  • Think about modular and standardized design.
  • Utilize value engineering to improve the design.

About Taurus Projects

Taurus Projects is a top-rated construction contractor in Fort Saskatchewan. We have been a prominent part of the Alberta and Western Canadian construction business landscape since 2006. Taurus Projects offers site construction services, mine site construction services, material management services, commercial fleet management services, and much more.

Looking for professional material management services? Contact us today.

The Main Differences Between Commercial And Industrial Construction

The-Main-Differences-Between-Commercial-And-Industrial-Construction

For a layman, commercial and industrial construction sites may seem to be the same. They may be unable to distinguish between them due to some similarities, but many factors make them different.

The permitting process, location, design and style of both constructions differ, but some people may use the terms interchangeably. Knowing some unique attributes and structures of industrial and commercial construction can help you differentiate between them. Let’s dig deeper to understand their differences and avoid mixing the two terms in the future.

Also Read: Questions You Should Ask Before Hiring A Commercial Construction Company

Permitting Process

All big construction companies require permits to carry out the construction process. Even signing may draw the legal attention of local authorities in some areas. Commercial building permits often concentrate on zoning restrictions, general safety and occupancy requirements. Once the requirements are fulfilled, a business can easily open its doors.

Compared to commercial buildings, industrial sites have more compliance requirements that must be considered. They become critical if the company handles or manufacturers hazardous materials. To fulfill all the requirements, it may take weeks or months to process. Moreover, these requirements may need to be necessitated with specialized building construction services.

Site Planning

Once construction companies get the green light, that is, the permit to start the work, then you can create a plan for how construction will proceed. The lead contractor will meet with their clients at this stage to determine their requirements and concerns. Doing so helps the engineers to determine the best possible solutions and helps to fulfill their needs.

Both commercial and industrial constructions are aimed to reduce the impact of their effects on daily operations. The only difference is how commercial development site planning emphasizes keeping enterprises open to the public and presentable to customers. Industrial sites are less interested in appearance and are interested in logistics, like the distribution of power usage.

Design Process

The construction design process is often the project’s most exciting part for both clients and contractors. It allows both parties to put their needs and requirements together to come up with ideas and bring them to life. But the design language used by the clients or the public will differ from industrial design language.

Traffic flow is vital for both types of construction, but the reasons for them are quite different. Commercial building sites must prioritize a simple, efficient traffic flow to increase client dwell time and promote lingering.

A industrial construction floor layout design emphasizes the following:

  • Enhanced productivity
  • Keeping a steady traffic flow
  • Improved efficiency

Infrastructure Support

Commercial sites do not differ very much from how homes are constructed. Some commercial sites, such as nursing homes, apartments and hotels, are built for short or long-term residential use. The infrastructure of commercial buildings usually contain HVAC systems that can control small ecosystems within larger systems; some provisions for higher power usage are standard infrastructure components.

Both construction types need robust supporting infrastructure to meet all of the requirements and have firm foundations. This not only includes the provision of massive power consumption but also the inclusion of waste management. These requirements have a very strong impact on the material change and the expertise required to build them.

Project Management

Most project managers can easily handle average constriction sites. The contractors they hire can also be very similar to those who can manage large residential projects. For example, project managers can concentrate on hiring the right professional plumbers, interior designers and electricians to get the job done well.

Although both construction types require almost the same set of skills, industrial sites also require different specialized and advanced skills. These requirements may include equipment assembling, custom fabrication and large-scale installation. Project managers should be able to handle complex logistics systems. Like when a plant has overgrown its area and needs to be relocated.

About Taurus

Taurus is an accredited construction company based in Fort Saskatchewan. We have a group of highly qualified and knowledgeable builders. Taurus Projects takes great pride in its team of expert construction professionals who strive to provide our clients with first-rate construction services. We oversee all kinds of construction projects, from material management to site services. Learn more about Taurus here.

For professional construction management services, contact us now.

Building Stronger Communities: How Taurus Projects Is Giving Back To The Community

Building-Stronger-Communities-How-Taurus-Projects-Is-Giving-Back-To-The-Community

Taurus Projects is a leading construction company known for its innovative construction solutions and exceptional customer service. Being responsible corporate citizens and running a successful business go hand in hand at Taurus Projects. That is why we are so dedicated to giving back to the communities in which we work and reside.

We strive to positively impact the lives of those around us by sponsoring local non-profit organizations and sports teams, and participating in community events.

This blog post highlights some of Taurus Projects’ ongoing efforts to help and strengthen the communities in which we work. We want to demonstrate how our commitment to community involvement is essential to our corporate identity and the positive impact these efforts have on the people and places we serve.

Providing Sports Team Sponsorships

Taurus is much more than just a construction services provider. We understand the value of sports in bringing communities together. Thus, we proudly support local sports teams such as the Fort Sask Junior B Hawks, Gibbons Broncos, Elk Island Wild, St Albert’s Women’s Curling Team, and Dance Moves II & III. By sponsoring these teams, we hope to provide them with the resources they need to succeed while encouraging healthy, active lifestyles in the community.

We are committed to being good corporate citizens and positively influencing the lives of those around us, whether through financial support or volunteering our time. Accordingly, sponsoring local sports teams has countless community benefits. Not only does it provide financial assistance to the groups and promote restorative and dynamic lifestyles, but it also demonstrates Taurus Projects’ commitment to being a responsible corporate citizen.

Organizing Trunk Or Treat Events

The Trunk or Treat event is a popular Halloween celebration held in Fort Saskatchewan every year. Participants decorate their vehicles and distribute treats to children, thereby creating a fun and safe environment for families to celebrate the holiday. Taurus Projects is pleased to have taken part in this event, which provides an excellent opportunity to give back to the community and make a positive difference.

Taurus Projects supports community events that unite people and foster a sense of belonging. Participating in the Trunk or Treat event demonstrates our support for the community and our endeavours to create a festive and welcoming atmosphere. Our participation in this event has contributed to developing more substantial, more connected communities and has been well-received by the people we serve.

Also Read: A Practical Guide To Construction Material Management

Sponsorship With The Town Of Gibbons

Taurus Projects is planning to announce a new sponsorship with the Town of Gibbons for future events. This partnership demonstrates our commitment to supporting the community and favourably influencing our service areas.

Taurus Projects will participate in various events as part of this sponsorship, including the Town of Gibbons Home Town Weekend and Pioneer Days. These gatherings bring people together, celebrate the history of the community, and encourage a sense of belonging. Taurus Projects participation in these events demonstrates its commitment to supporting the community and making a positive impact.

Introducing The Food Drive Initiative

Taurus Projects food drive Initiative is a yearly effort to support the local food bank and assist those in need. Our goal is to collect as many non-perishable food items as possible and deliver them to the food bank to help improve the lives of those who rely on their services.

Taurus Projects is dedicated to making an impactful and lasting difference in the community. Our food drive initiative aims to provide much-needed assistance to the local food bank and assist those in need. Our team works tirelessly to collect food donations, raise awareness about the initiative, and deliver all items to the food bank.

Taurus Projects Vision

Taurus Projects believes in making a positive difference in the communities it serves. Our core values of hard work, responsibility, and a commitment to excellence in everything we do motivate us to make a difference.

Donations to local sports teams, participation in Trunk or Treat events, food drive initiatives, and a new sponsorship with the town of Gibbons are examples of our community involvement.

These efforts demonstrate our dedication to positively impacting and strengthening communities. Each of our community involvement efforts corresponds to our values differently.

About Taurus

Taurus is an accredited construction company based in Fort Saskatchewan. We have a group of highly qualified and knowledgeable builders. Taurus Projects takes great pride in its team of expert construction professionals who strive to provide our clients with top-tier construction services. We oversee construction projects, from material management to site services. Learn more about Taurus here.

For professional construction management services, contact us now.

How We Ensure The Quality Of Our Commercial Construction Projects

How-We-Ensure-The-Quality-Of-Our-Commercial-Construction-Projects

Constructing a new commercial building is a complex and challenging process that requires careful planning, execution, and coordination. Maintaining quality during a commercial construction project can be difficult, especially when there is a deadline to meet. However, with experienced construction contractors, their proper planning, strategies, and the use of technology, the quality of the project can be ensured.

A well-designed and constructed commercial building by professionals can significantly impact a business’s success by creating a positive image, attracting customers, and improving customer experience. The commercial building should not only be sturdy and have physical integrity, but should also be visually appealing and represent the business’s brand.

This blog post highlights the steps that are involved in ensuring the quality of commercial construction projects.

Steps Involved In Ensuring The Quality Of Commercial Construction

The following are the steps that a reputable company takes when providing commercial construction services to ensure quality.

1. Adhering To Building Codes

Adhering to building codes and regulations is essential for ensuring the safety and accessibility of buildings and protecting the health and welfare of the public. Codes and regulations for the building are established by local governments that outline the minimum standards required for construction, including requirements for structural integrity, fire safety, accessibility, and energy efficiency.

Noncompliance with building codes and regulations can result in fines, legal action, and even building demolition.

2. Using The Right Quality Materials

Using quality materials in commercial construction is essential to ensure the durability, longevity, and safety of a building. Good quality construction materials are designed to meet specific standards and requirements, such as strength, durability, and fire resistance.

Using quality materials in construction can increase the longevity of a building and reduce the need for repairs and maintenance over time. Additionally, many quality materials are designed to be energy-efficient, which can reduce energy costs and improve the overall sustainability of the building.

It is vital to choose the right materials that are suitable for the specific application, meet local building codes, and are compatible with other materials used in the construction. Not using quality materials can lead to issues such as structural failure, leaks, mold, and even fire hazards.

3. Hiring Skilled Labour

Hiring skilled labour in commercial construction is important to ensure the quality, safety and efficiency of a building project. Skilled workers are trained and experienced in the specific tasks they perform. They can understand and interpret construction plans and building codes and use the proper tools and techniques to complete their work.

Skilled labourers also have knowledge of safety regulations and protocols which is essential in a construction site. Regular inspections during construction can help identify and fix any issues before they become significant problems.

Inspections are typically conducted by building officers or qualified professionals to ensure compliance with building codes and regulations, as well as the plans and specifications for the project. Inspections can be done at various stages of construction, such as at the foundation, framing, and final stages.

4. Using The Right Equipment For Construction

Using the right equipment for commercial construction is important to ensure that the work is done correctly and efficiently. The type of equipment used in construction will vary depending on the specific task or the stage of the project. Some examples of common construction equipment include excavators, bulldozers, cranes, backhoes, and concrete mixers.

Having the right equipment can help make a construction project run more smoothly and efficiently. The right equipment can help improve the speed, quality, and safety of the work. It can also help to reduce the risk of injuries, accidents, and damage to the site.

About Us

Taurus Projects is a top-rated construction contractor in Fort Saskatchewan. We have been a prominent part of the Alberta and Western Canadian construction business landscape since 2006.

Taurus Projects offers site construction services, mine site construction services, material management services, commercial fleet management services, and much more.

Contact us for more details.

Using Green Building Techniques In Commercial Construction

Using-Green-Building-Techniques-In-Commercial-Construction

Building projects that can be leased or outsourced in the private sector are included in commercial construction. These areas could be anything from constructing new workplaces and manufacturing facilities to hospitals and shopping malls. All commercial construction projects are individual and vary in scope and effort. The customer makes all decisions regarding the layout and design of the structure.

Every client is different, and so is the case with their unique projects. A project in the commercial building industry can be divided into three sizes: small-scale, medium-scale, and large-scale.

Regardless of the size of your commercial construction project, you must ensure that you select a licensed commercial contractor to complete it. Only these professionals have the skills and knowledge needed to develop your desired commercial spaces.

Read Also: The Top 5 Common Types Of Commercial Construction Projects

How Does Using Green Building Practices Benefit Your Commercial Construction Project?

One of the most popular trends in commercial construction is green building technologies. The advantages of implementing green technology in construction are extensive and wide-ranging, providing both newly constructed facilities and existing buildings with considerable benefits.

Buildings with a lower carbon footprint and less impact on the environment are made via the use of green construction technology. When green construction technology is used, builders, building owners, and renters all benefit from:

  • Limited exposure to pollutants
  • Water conservation
  • Use of safe and non-toxic materials
  • Reduced carbon footprint
  • Savings on energy and the accompanying utility costs
  • Reduced waste generation as more recyclable materials are used

Leading Green Commercial Construction Techniques

Construction firms started using green technologies in commercial construction structures to improve environmental preservation. To satisfy the demands of environmentally conscious clients, these businesses install geothermal heating, eco-friendly paint, cellulose insulation, renewable energy systems, and rainwater collection equipment. The following are the main types of green build technologies being used.

1. Eco-Friendly Insulation

A well-insulated commercial space provides a conducive and comfortable environment for all its inhabitants. Today, therefore, in many ways, it’s important to be aware of your insulation options and choose one or more that best suits your unique needs.

A building’s insulation technique plays a huge role in conserving energy and keeping bills at bay. The material used in the walls prevents heat from leaving the building, allowing the climate control system to operate more efficiently. However, because they are not sustainable, conventional insulating materials harm the environment.

High levels of greenhouse gas emissions are produced during the manufacturing of traditional insulating materials like polyurethane. They have such a big influence on the environment that it would take nature more than a century to compensate for the damage.

However, modern commercial construction firms have switched to more sustainable insulating materials such as fibreglass and cellulose. fibreglass is recyclable, which reduces the amount of non-biodegradable waste.

2. Using Geothermal Heat

A highly effective renewable energy technology known as geothermal heat pumps is becoming increasingly common in commercial construction services. Geothermal heat pumps are used for both heating and cooling water.

Geothermal heating systems can be installed by commercial construction companies to increase sustainability. In a business environment, heating and cooling costs represent a significant portion of the monthly operating budget.

Compared to typical furnaces, boilers, air conditioners or heat pumps, geothermal heat pumps for commercial buildings provide superior heating and cooling at a significantly lower and more energy-efficient price. Since the cost of heating and cooling sites account for the majority of energy use, geothermal heat pumps are quickly replacing conventional systems.

3. Sustainable Paint

Modern commercial construction teams use environmentally safe paint when working on painting tasks. The volatile organic compounds (VOCs) found in conventional paints leak into the atmosphere, lowering air quality and disrupting the environment.

Your paint may include mercury, formaldehyde, petrochemicals, benzene, lead, diethyl phthalate, and other substances. These compounds damage human health, interfere with the environment and are non-biodegradable. Alternative paints could be utilized by construction businesses to lessen the harm done to the environment.

4. Airy Roofs

The goal of cool roofs, a sustainable green design technology, is to deflect heat and sunshine. By reducing heat absorption and thermal emittance, it helps maintain buildings at their recommended room temperatures. Reflective paints and unique tiles, which absorb less heat and reflect the majority of solar radiation, are used in the overall design.

For instance, during the summer, cool roofs can lower temperatures by several degrees. Therefore, cool roofs lessen the need for air conditioning, which lowers energy consumption and lowers overall greenhouse gas emissions from the use of electricity and HVAC systems.

Installing eco-friendly technology in your place of business will help you reduce your impact on the environment. Consider which gadgets will reduce your carbon footprint in Edmonton first, as many are region-specific. Then look into commercial construction contractors in Edmonton that can install these things.

About Taurus

Taurus is a licensed building business with offices in Fort Saskatchewan. We have a group of highly qualified and knowledgeable contractors. Taurus Projects provides a wide range of services, including site construction, mine site construction, material management, commercial fleet management, and more.

Contact Us for more details.

How To Enhance Safety With Construction Material Management Services

How-To-Enhance-Safety-With-Construction-Material-Management-Services

The massive fluidity involved at a construction site means there is a wide range of risks present at such sites as well. Various heavy equipment and machinery are used at both residential and commercial construction sites that also carry different types of risks.

Therefore, it is important to rely on professional construction contractors who can implement the best construction material management practices to ensure maximum safety.

If you are not fully familiar with the correlation between material management and the safety of construction, keep reading to learn all about it.

Allocate Areas For Material Storage

One of the most important parts of professional construction material management services is that a separate area is designated for material storage. When you rely on experienced construction contractors, you can make sure that the storage requirements of a construction project are fulfilled in the best way possible.

It is also possible for construction contractors and managers to allocate different zones for varying types of construction material as well as the waste generated as part of construction procedures.

For instance, separate areas can be made to store waste, such as organic waste, wood, glass, and chemicals. This will significantly improve the waste management process of a construction project as well.

Once you have made such areas, make sure that you also mark the areas with relevant flags and safety signage to ensure everyone on the construction site is familiar with that zone.

Also Read: A Practical Guide To Construction Material Management

Avoiding Unsuitable Storage Spots

The efficiency of a construction project is dependent on many different factors, including construction material management. An inexperienced contractor construction manager can make the mistake of storing construction material in unsuitable locations, such as near a footpath or in areas that experience high traffic.

This is a very big mistake to make as anyone can trip in such areas and cause an accident. When you hire experienced construction contractors, they will always make sure that the construction materials are stored properly as part of their construction material management services.

Handle Hazardous Materials

A large amount and variety of waste are made at a construction site. A lot of this waste can be hazardous in nature. Dealing with such kinds of waste can be very challenging, especially if you don’t have any prior experience.

Therefore, it is highly recommended that you hire professional construction material management services to ensure the experts can deal with hazardous waste as per the legal regulations and industry standards.

Oversee Construction Material Deliveries

A lot of deliveries have to be made to construction sites. It can be challenging for the construction labour to supervise the delivery of the construction material and store it safely in a suitable location. If the construction material is not properly managed, it can compromise the overall safety of the site.

However, if you hire professional construction contractors, you won’t have to worry about the safety and efficiency of the material deliveries and storage. Experts will make sure that all of the relevant construction material is placed in suitable locations at the time of delivery so that there is no unnecessary clutter on the construction site and safety is not compromised.

Proper Management And Cleanliness

Keeping a construction site as organized as possible can significantly improve the efficiency of the on-site workers and help the construction contractors in completing a project on time.

Proper organization and cleanliness ensure that the workers and contractors are able to navigate the construction site easily without facing any obstacles. Professional contractors can also give proper training to the on-site workers to follow the correct construction working procedures.

You should also keep in mind that there are certain rules and regulations that construction project managers and contractors must follow to avoid running into legal issues.

All of these aspects are covered in professional construction material management services provided by construction contractors. Ultimately, proper construction management leads to greater safety, efficiency, and productivity.

About Taurus Projects

Taurus Projects is a professional construction company in Fort Saskatchewan. We offer high-quality construction services with the help of our experienced and well-trained construction contractors.

Construction material management services are an integral part of our services. Therefore, if you want to get high-quality construction management services to maximize the safety and efficiency of your construction procedures, you can contact us at any time for further information.

How To Optimize And Improve Material Management Inventory In Construction

How-To-Optimize-And-Improve-Material-Management-Inventory-In-Construction

Given the current business environment, businesses are aiming to become profitable as soon as possible. Controlling organizational costs and boosting income flow are both necessary to reach this goal.

Profitable construction projects are the product of effective coordination of labour, materials, and equipment management. Too frequently, contractors focus on work or cost reduction and fail to take advantage of the chance to enhance productivity by putting material management systems in place.

Maximizing inventory management efficiency is essential as it involves significant expense. Achieve effective material management by acquiring the assistance of reliable construction contractors. We also suggest the following methods for an organized approach to enhance your inventory planning and management process:

Also read: A Practical Guide to Construction Material Management

Analyze Inventory Management

The inventory management process is thoroughly examined in the first step to ascertain its status. Determine each stakeholder’s roles in the process, the challenges they will face, and how they may better do their jobs more efficiently. Examine how the various process units interact and determine whether there is a clear division of labour or overlapping duties.

It would be beneficial for the evaluation to contrast the company’s inventory management procedures with those of the leading companies in the sector. Inform all stakeholders of the assessment’s findings and the suggested improvement strategies so they may participate in the improvement process.

Create A Plan For Managing Inventory

An action plan should be created based on the assessment results. Inventory must be divided into raw materials, work-in-process, and finished commodities. Each category needs to be further divided into subcategories using several classification standards. Each sub-segment should have an individual action plan in a good action plan, which is then merged to provide an overall inventory plan.

The inventory management process should have quality control standards and operational definitions, especially if the business has recently undergone a merger or acquisition, introducing new requirements.

Here, correcting operational shortcomings is the first step. In light of the potential delay in addressing these issues, an interim strategy to achieve inventory goals is required. The entire project may be carried out after specific resources, such as technological systems, are available.

Having professional construction contractors with material management skills to handle the supplies and inventories will allow you to have a workforce that is best for your company.

Implement A Strategy

The following action should be to carry out the plan. The performance of the inventory process depends on maintaining established quality control criteria and monitoring the process. Only when required, must management accept any deviations from the plan. All parties involved in the inventory process, including suppliers, should collaborate and communicate openly.

The inventory management system should be standardized so that it is easy to use and tasks can be assigned easily.

Analyze The Results Of The Plan

Since organizations cannot improve what they do not measure, doing this is essential to maintain improvement. Any action taken throughout the inventory process that deviates from the established plan should be considered and addressed immediately.

Make Sure That Improvement Is Ongoing

Opportunities for improvement should be sought to keep the inventory process efficient and strengthen it enough to handle unanticipated situations like supply chain disruptions.

Your professional construction contractor will ensure that the process is continuously reviewed, data analytics are improved to ensure optimal delivery metrics, and minimum stock orders are reduced. Investigating process deviations and codifying solutions should also be done, as should increasing staff operational expertise, working with suppliers to implement operational improvement plans, and reducing cycle and lead times across the board.

About Taurus Projects

Taurus Projects is a professional construction company in Fort Saskatchewan. We offer high-quality construction services with the help of our experienced and well-trained construction contractors.

Construction material management services are an integral part of our services. Therefore, if you want high-quality construction management services to maximize the safety and efficiency of your construction procedures, you can contact us anytime for further information.

Questions You Should Ask Before Hiring A Commercial Construction Company

Questions-You-Should-Ask-Before-Hiring-A-Commercial-Construction-Company

It might be challenging for someone to find the best commercial construction firm to manage their project as there are many companies competing for the same projects in the construction industry. Researching a firm requires asking the correct questions, which in this case, means doing your homework.

Hiring a professional commercial contractor from a certified construction company is important because the better the contractor, the better your project will be.

Also Read: The Top 5 Common Types Of Commercial Construction Projects

The following seven inquiries should be made while deciding whether or not to hire a construction company. Their responses can frequently act as a litmus test to eliminate the pretenders and draw attention to the contenders:

What Is Your Professional Background?

Construction companies with a long history have a proven track record that speaks louder than any sales pitch. They will most likely be offering the going rate for similar jobs as they have a good idea of what a job will cost.

Companies that bid ridiculously low are probably taking shortcuts or don’t have enough experience, which forces them to bid lower than their competitors. Also, some companies will only deal with certain kinds of buildings, like office buildings or storefronts.

What Have You Done In The Past?

A company with any experience in a commercial building will be more than willing to provide examples of their prior work. They do this because they are aware of how well such an effort reflects on their business. It wouldn’t be inappropriate to ask for references within the question itself to find out if previous clients were pleased with their work and whether they had repeat business from the same firm.

How Far Along Are You With This Project’s Schedule?

Businesses in this industry should have a timeline created that details when the design process will start and when construction will really be finished. Any firm that claims speedy completion may be again using shortcuts to achieve deadlines, as the plan should have adequate room built in to account for bad weather or other potential delays. If a company has trouble meeting deadlines, it’s best not to work with them anymore.

How Safe Have You Been?

Companies are glad to provide proof of their capacity to keep a project going if they keep good records on safety concerns and resolve any issues as soon as they arise.

Workplace accidents slow down operations, and businesses that become defensive when asked about their safety record are typically trying to conceal something, which is a huge red flag. Working with a construction company that doesn’t care about safety is a sure sign that they won’t care about other things either.

Professional construction companies care about their customers; hence, make sure you hire commercial contractors from an accredited construction company.

Are The Project Cost Fixed Or Estimated?

The cost of a project can be accurately estimated by an experienced commercial construction business as they will have ties with suppliers.

This enables them to input fixed expenditures that can be relied upon to stay the same rather than shocking the client with unanticipated additional charges that might irritate them. The commercial construction company should be able to give you a list of the fixed costs on an invoice

.

What Kind Of Construction Alternatives Do You Provide?

Every project is unique. What may be effective for one owner may not be effective for another. It is crucial to confirm that the company you are considering delivers the appropriate services for your project. You’ll save time and money if you use the appropriate commercial construction company.

What Distinguishes Your Procedures And Customer Care From Others?

Experienced construction companies should have their own set of procedures and processes that make them stand out from their competitors.

Without established processes and procedures, projects may take longer and end up costing the client more money. Before you break ground on your project, it is crucial to find out about a company’s special processes so you can get a sense of how it will proceed.

About Taurus Projects

Taurus is an accredited construction company based in Fort Saskatchewan. We have a group of highly qualified and knowledgeable builders. Taurus Projects is very proud of its team of skilled construction workers who work hard to give its clients the best construction services possible. We oversee all kinds of construction projects, from material management to site services. Learn more about Taurus.

For professional commercial construction services, contact us now.

5 Material Management Tips To Help Contractors Increase On-Site Productivity

5-Material-Management-Tips-To-Help-Contractors-Increase-On-Site-Productivity

Construction has long been known as a mismanaged and wasteful business. But thanks to technological improvements, various organizations and projects are being optimized. Numerous industries are looking for new ways to boost productivity. However, the available solutions are typically so expensive that most contractors are unable to afford them. Nonetheless, there is one method that can increase productivity; material management.

The average construction worker spends several minutes looking for misplaced components, tools, and equipment. That time adds up rapidly, totalling thousands of lost and idle hours per year for a workplace.

Lost time can result in increased costs and delayed progress, affecting the success of the project. The key to keeping everyone (and everything) functioning like the well-oiled machine you rely on is to manage on-site resources effectively and efficiently.

Our recommendation is to hire accredited construction contractors for the best possible material management for your construction. Here are five material management recommendations from us to help you streamline and simplify your job site processes:

Eliminate Material Duplicate Handling

Increasing efficiency implies shortening the time and number of steps required to transport commodities from point A to point B:

Rely on delivery personnel to transfer items to the appropriate area on your property. This saves your team time relocating supplies after they’ve been placed, keeping your costs under control and the project on schedule. Avoid transferring objects more than once. The goal should be to get materials as close to the installation site or centralized, well-organized storage space as possible.

Make sure your deliveries are coordinated so that the appropriate staff are ready to help unload goods or provide direction on where materials should go. Outline a delivery plan that contractors and subcontractors can follow. But keep it flexible enough to handle exceptional activities and shipments with difficult delivery times (like orders being transported via long-distance trucking).

This is why professionals should be hired to supervise your material management, as they are fully trained in doing an efficient job.

Reduce The Distance To Obtain Materials

Every minute counts in the workplace, which is why having materials nearby is essential.

To limit the amount of time your personnel must spend obtaining and replacing tools and equipment, supplies should preferably be kept as close to the installation location as possible. Consider storing smaller things in designated, well-organized containers and replacing them as needed from on- or off-site inventories.

Use The Proper Storage Options

Your storage arrangements should always be carefully constructed to account for the physical constraints and inventory timetables (what’s coming in and when, what will be used, and when, etc.) unique to your job site.

Here are a few things to bear in mind:

Take into account the weather: Some supplies can be stored outside (on pallets to protect them from ground moisture and covered by a roof or tarp), whilst others (such as power tools) must be kept indoors at all times when not in use.

Sort supplies as soon as they arrive, prioritizing them in the order you’ll need them to ensure easy access.

Before garbage is collected from the jobsite, make sure you have enough space to segregate it by kind (metal, wood, drywall, etc.). Having the right storage solutions and reliable material management professional can make it easier to handle materials during the course of your project.

Also read: Essential Tips To Streamline Construction Material Management.

Examine Your Costs And Productivity Levels

You need to know what problems and conditions you’re up against in order to analyze and adjust your strategies. Implementing a tracking system will allow you to keep track of the movement of materials and personnel on your job site in order to identify the following:

  • Flaws related to the planning process
  • Working situations that may be hazardous
  • Inadequate supplies of required tools, components, and equipment
  • All of these elements might have an impact on the efficiency of your teams as well as the prices (both material and labour)

About Taurus Projects

Taurus is a Fort Saskatchewan-based authorized construction contractor. We have a team of builders who are highly skilled and knowledgeable. Taurus Projects takes great pride in its team of qualified construction professionals, and we oversee all kinds of construction projects, from material management to site services. Learn more about Taurus.

For professional construction management services, contact us now.

Top 4 Material Management Challenges In The Construction Industry

Top-4-Material-Management-Challenges-In-The-Construction-Industry

The right material strategy may increase labour productivity by 4% to 12%, which is why efficient material management is vital on any worksite, regardless of size or location. If supplies are improperly handled, it can have a cascading impact, delaying the following processes and increasing costs.

Material ordering and delivery prove to be crucial in the construction industry for the proper execution and completion of any project. In the case of a prominent organization, the person in charge of acquiring supplies or the purchasing department must guarantee that the necessary items in the exact quantities are ordered. They must also confirm the release dates for the material and explicitly state those dates as well as the place of delivery to the provider.

We’ve highlighted some common material management issues contractors may encounter at each stage. From obtaining a bid to handling supplies after they’ve been delivered, an accredited construction contractor with material management expertise can help finish the construction timely.

Bid Procurement

It is standard for the scope of a project to alter as it progresses, which can have an impact on the bidding process. An excellent example is if the property owner decides to modify the materials to something of higher quality without changing the overall budget of the project. Typically, the general contractor will agree to this and then collaborate with their on-site contractors, such as the electrical contractors, to establish what modifications may be made and how to make them.

For example, suppose the property owner wishes to use higher-quality materials but does not wish to increase the entire expenditure. The general contractor or project manager must collaborate with on-site tradespeople (such as mechanical or electrical contractors) to establish what, how, and where concessions can and cannot be made.

This problem can be prevented by simply keeping all of the contractors in communication and involved throughout the project. Obtaining all of the contractors, including the electrical contractor, from the start will help avoid this problem. The contractors can all present the owner with more realistic costs and timetables, and they will be able to assist the general contractor in determining what modifications to the project can genuinely be done to achieve the adjustments the owner desires.

Purchasing Materials

The majority of job sites will handle two sorts of supplies:

  • Fittings, fasteners, ties, wires, cables, straps, and conduits are miscellaneous goods.
  • Fixtures, alarm systems, cement, glass, and switchgear are job site-specific (and occasionally custom-designed) materials.

Although some builders will prefer to negotiate specifications and prices directly with manufacturers, others must acquire components from a supplier-distributor. It is vital to find a trustworthy supplier to ensure that products are supplied in the amounts required and on the dates stated.

Depending on the type of material, some organizations may use independent agents to select and buy suppliers. Suppliers are often chosen based on the lowest price. However, contractors may consider higher-priced suppliers that give superior services or have a track record of supplying the proper material in the quantities required stated. In some cases, incomplete supplier offers may cause delays in the selection process.

Getting The Correct Bill Of Materials Listings

Errors in the billing sheet might have serious consequences. Inaccurate inventory, for example, might cause production downtime, adding time to the total product development cycle.

Missing components on a bill of materials will have the same effect, and product pricing inaccuracies will reduce your overall investment return.

If you’re having trouble preserving an accurate bill of materials, you might want to consider hiring some help. Construction firms may manage their projects more efficiently thanks to modern enterprise resource planning (ERP) software.

We must not overlook material requirements planning (MRP), a critical component of ERP. It is pertinent to hire a reliable construction contractor for efficient material management services to deflect this problem completely.

Also read: Can Efficient Material Management Save Costs?

In conclusion, a bill of materials is essential if you wish to avoid mistakes in material sourcing and procurement. It is preferable to use modern planning software for this purpose as it will make your life easier.

Handling And Storage On The Job Site

The majority of material-management concerns that construction contractors face occur on the project site, including material tracking, storage issues, material distribution, and rehandling.

One of the most intricate difficulties for an electrical contractor is keeping track of products. Undeliverable items are identified as requested or delayed by tracking. Tracking is also necessary when determining what resources are accessible to reduce theft or loss, identifying where it is held on-site, and controlling inventory expenses. Suppliers may supply materials that must be returned in some cases.

In this situation, the contractor incurs no direct expenses. Nevertheless, indirect costs may be paid due to potential delays in completing affected activities. In other cases, warehouse staff may misplace or shift material, and it may not be correctly identified before storage. Furthermore, material may be lost, damaged, or stolen after it has been issued, posing a significant difficulty for the contractor. A computerized system, such as bar codes, could increase tracking and inventory control while reducing loss and material misplacement.

About Taurus

Taurus is a Fort Saskatchewan-based authorized construction contractor. We have a team of builders who are highly skilled and knowledgeable. Taurus Projects takes great pride in its team of qualified construction professionals, and oversees all kinds of construction projects, from material management to site services. Learn more about Taurus.

For professional construction management services, contact us now.