Common Causes Of Construction Rework And How To Avoid Them

Common-Causes-Of-Construction-Rework-And-How-To-Avoid-Them

Nobody wants to hear the word “rework” during a construction project. It usually indicates that a portion of the work must be repeated to solve the issue, which frequently has a negative influence on the timeline and cost.

There are several moving pieces in construction projects. Even with careful planning, there is always the possibility that things might not go as planned. This can lead to financial and timeline overruns.

Rework is one of the most prevalent issues for construction contractors, and it may have a disastrous impact on a project’s cost and schedule. This is why it is critical to limit or eliminate rework. To do so successfully, construction managers must first understand why rework happens and the ramifications it has in the building industry. Continue reading to find out more.

Also Read: The Significance Of The Design Phase During Pre-Construction

Problems With Planning And Scheduling

Schedule issues can cause a variety of complications on projects, one of which is reworking. As projects fall behind schedule, poorly completed work can result in defective production and other quality concerns, putting a project even farther behind.

Rework might also result from sequencing and coordination issues. Work done out of order can prohibit subsequent work from being completed effectively, necessitating the removal and reconstruction of previously installed equipment. Out-of-sequence work is frequently caused by the insufficient coordination of various workers or subcontractors.

Design Issues

Errors and omissions in concept designs and agreed-upon design changes are examples of design-related rework issues. Omissions are frequently outside the control of construction contractors. However, contractors may occasionally assist in identifying these issues during the bidding and design review stages. When designers and builders work together from the start, as in design-build contracts, builders have a greater possibility of uncovering design flaws before construction begins.

The owner, designer, or contractor can begin agreed-upon alterations that are unrelated to design flaws. Design modifications, regardless of who initiates them or the rationale for them, can result in rework, especially if they are made after construction has already started.

Defective Materials And Equipment

Sometimes a piece of work may be adequately put together, but the materials used fall short of expectations, necessitating rework. Concrete that does not meet strength criteria, windows with the improper type of glass, or other inferior elements must be abolished and replaced.

Mechanical or electrical equipment that does not perform correctly after placement or construction equipment that malfunctions and ruins previously completed work are examples of equipment faults. In certain circumstances, these conditions also pose a threat to one’s safety.

Site Management Issues

Errors come from a lack of effective management and construction oversight, poor staff cooperation, confusing instructions to workers, and excessive overtime. Workers should receive proper training and instructions for the specific assignment. To minimize mistakes and conflicts of interest, later on, each employee should understand their job at the site.

Possible Solutions

Invest in Digital and Connected Solutions

The right technologies may go a long way toward preventing construction rework. Automating numerous building processes eliminates repetition and lowers the chance of mistakes. However, you should invest in construction-specific tools to help you properly manage your project. These technologies will streamline operations and give you vital information, allowing you to make knowledgeable choices faster.

Ensure Appropriate Planning

Make sure that you are fully prepared before starting any project. Conduct a thorough constructability evaluation and verify that you have the necessary equipment and staff. Preparing for a project will also include aligning teams and ensuring a coordinated and transparent flow of information. Finally, make a clear strategy to assist you in attaining your objectives.

Set A High Bar For Quality

You will likely experience rework if you do not have a rigorous quality control strategy. It is critical to have a straightforward, defined procedure in place to assure the project’s quality at all times. Verify that you and the client agree on what defines excellence and that this information is communicated to all employees.

Maintain track of concerns frequently to ensure project safety at all times. This will allow you to spot and resolve mistakes early on.

Ensure Effective Communication

Every day, construction managers deal with a plethora of administrative tasks. Failure to keep all parties informed at all times might result in costly errors. Consider using cloud-based technologies to boost team cooperation and communication. A single data source ensures that the proper personnel have easy access to the information they need to do their jobs.

About Taurus Projects

Taurus Projects is a renowned construction contractor in Fort Saskatchewan. We offer a variety of industrial and commercial construction services. By utilizing our team of professionals who have been offering high-quality services for more than ten years, we hope to help you streamline these crucial services and maximize your efficiency. Want to avoid costly reworks? Contact us for more information.

What Is The Role Of A Construction Contractor?

What-Is-The-Role-Of-A-Construction-Contractor

Construction sites can be messy and can get even messier when wanting to demolish, rebuild and furnish a site.

Luckily for you, construction contractors take all of that hassle out of your hands and provide you with a finished building with the best subcontractors working under their supervision.

A building contractor plans and coordinates construction activities, and finishes the project within the established time and budget. Contractors are responsible for the whole construction process and should decide the best techniques to complete the project as specified.

You might be wondering, what exactly is the job of a construction contractor? Read this blog to find out the roles and responsibilities of reliable construction contractors.

Also read: Types Of Construction Contracts You Should Know About

General Duties Of A Construction Contractor

In general terms, a contractor is liable for planning, leading, executing, overseeing, and inspecting a building construction project. The obligation extends from the start to the end of the project, no matter what its scope. They are also in charge of the demolition and renovation of the site.

A contractor might hire more required assistance for distinguishing areas such as site setup or snow removal.

Planning The Project

If there is a shortage of labourers, a construction contractor company can provide experienced and reliable staff who are experts in their work.

Any delay in the project is to be justified if the project was postponed by external factors as far as the contractor might be concerned.

The first duty of a construction contractor is to create a project plan to deliver it on time. Some obligations include:

  • Planning all critical project improvement and implementation details.
  • Procuring the material prerequisites and getting the equipment required for construction ready
  • Risk management, mitigation and prediction of any issues that may arise
  • Dealing with all and any legal or regulatory issues.

The building contractor should lay out a budget for the construction project, and follow it as intently as could be expected.

The budget is a valuable instrument to follow for project cost since contractors can distinguish waste by contrasting their actual costs and the arranged budget.

Project Management

The contractor needs to finish the project on time and be careful about numerous construction management activities.

  • Ensuring reserves are accessible to keep the destruction or redesign project moving
  • The arrival of material on site when required
  • Purchasing or leasing the construction equipment expected for the project
  • Interviewing and hiring subcontractors to finish specific work
  • If immediate payments are required, there should be reports to justify it

Building contractors are likewise answerable for their personnel, ensuring their staff has the right size and specialized skills. Contractors additionally oversee payroll for their employees and subcontractor payments.

Tracking Of The Project

Project tracking is fundamental to concluding the work according to contract specifications and agendas. As well as tracking progress, contractors should prevent disruption which is why they utilize some activities. This includes:

  • Quality control
  • Using construction strategies that prove to be practical
  • Ensuring an unbroken supply of materials ordered ahead of time to avoid delay
  • Construction site safety measures taken strictly

During the construction process, a construction contractor is answerable for tracking progress and dealing with any vital changes. Contractors should constantly have the project scope, time, and budget as their top priority when deciding.

Legal Issues

Contractors have a fair bunch of liabilities concerning legal and regulatory issues. They should obtain each important permit and license before beginning the project while helping the contractors with any taxes or legal paperwork when required.

Likewise, the whole construction process should follow legislation and building laws.

Health And Safety

The contractor must guarantee health and safety at the construction site, by implementing adequate procedures and raising awareness among workers.

The contractor is also responsible for the proper operation of equipment and preventing accidents.

About Us

Taurus Projects is a prominent construction contractor in Fort Saskatchewan. We deliver a variety of industrial, and commercial construction services. By utilizing our team of specialists who have been offering high-quality services for more than a decade, we hope to help you facilitate these essential services and maximize your efficiency. Contact us for more information regarding construction contractors.

Advantages Of On-Site Fleet Vehicle Maintenance

Advantages-Of-On-Site-Fleet-Vehicle-Maintenance

Fleet managers are familiar with the significance of a modern fleet management company. Undeniably, there are a lot of challenges involved in maintaining vehicles in their optimum working conditions.

Resultantly, the trend of on-site fleet vehicle maintenance is becoming quite popular among different companies and construction sites. The service provides numerous benefits, such as cutting down costs and improving maintenance procedures.

Let’s discuss the benefits of on-site fleet vehicle maintenance in this blog post.

Better Efficiency

Preventive maintenance is the best way to make sure your vehicles do not suffer from major breakdowns and issues that can adversely impact the productivity and efficiency of the entire fleet.

By relying on professional fleet management services, you will not have to worry about sudden breakdowns and equipment failure. Instead, most of these issues will be prevented and resolved quickly.

As a result, your productivity and efficiency will get a huge boost. Preventative maintenance is also useful for companies to easily schedule downtime without suffering productivity loss.

Minimise Vehicle Downtime

Using the traditional method of taking your vehicles to an auto repair shop for maintenance and repairing is a time-consuming process. When you have a large fleet of vehicles, it will take a lot of time and energy, due to which your business will suffer.

On the other hand, if you use professional fleet management services that offer on-site fleet maintenance services, you will be able to reduce vehicle downtime.

Quick on-site vehicle maintenance services help you to get access to the vehicles on time so that they can fulfill their purpose with maximum productivity.

Save Money

On-site fleet vehicle management and maintenance services help you in saving a significant amount of time in the long run. This type of maintenance is efficient as it prevents breakdowns and minimizes unnecessary driver pay.

Moreover, preventive maintenance also helps you in saving money on extensive repairs. There is a high chance that you can fix small issues quickly during regular maintenance before they turn into serious problems. Therefore, preventive maintenance with the help of on-site fleet maintenance services is much better than reactive maintenance.

Fleet managers that rely on modern fleet management systems for comprehensive training and maintenance are able to save a significant amount of money by maximising efficiency and productivity.

Also Read: Innovations In The Commercial Construction Industry

Better Safety

Fleet management and maintenance are important to increase driver safety. Well-maintained vehicles reduce the risks of accidents by making sure everything is working in the best possible condition. If vehicles are not well-maintained, there is a risk of problems like brake failures and tire blowouts.

Improve Fleet’s Lifecycle

Routine inspection and maintenance are important to improve the lifecycle of your vehicles by increasing the lifespan of the vehicles and their parts. If the parts get damaged, you will likely have to spend a lot of money to repair them.

Reduce Operational And Fuel Costs

Regular maintenance of the vehicles is important to minimize the time a vehicle spends off the road. It simply means that you will be able to use the vehicle to fulfill its purpose, such as on construction sites for the maximum period of time. Therefore, it will help you in saving high operational costs.

Similarly, ill-maintained vehicles tend to consume a lot of fuel and result in higher fuel costs. You can avoid this issue through professional on-site fleet management services and benefit from the regular maintenance of the vehicles.

Real-Time Data

Fleet management solutions provide you with real-time data. You can analyze such data to make smart business decisions and enhance the productivity of your fleet’s vehicles. This type of real-time data is also important to ensure the vehicles are maintained in the best possible conditions through regular maintenance.

Better Customer Service

Since fleet management services allow you to plan your routine maintenance in advance, you do not have to hinder the company’s core operations. Instead, you can focus on fulfilling the requirements of the customers and let the professional technicians handle procedures like maintenance and the repair of vehicles.

About Taurus Projects

Taurus Projects is a renowned construction contractor in Fort Saskatchewan. We provide a wide range of construction and fleet management services. Our goal is to help you streamline these important services and maximize your efficiency by relying on our team of experts who have been providing quality services for over ten years now.

If you want to learn more about our services, you can contact us for more information.

Innovative Trends In Commercial Construction

Innovative-Trends-In-Commercial-Construction

The most recent developments and exciting new technologies have the potential to change the industrial and commercial construction sector significantly. The new design ideas and building techniques have a lot to offer, from automated intelligent buildings that can adapt to the demands of their residents to structures that produce electricity on-site using wind and solar power.

The world now is very different from how it was a few decades ago. Innovative construction methods accelerate the construction process, provide high-quality structures, and increase security and safety. Working with an experienced commercial construction company ensures that prospective property owners or business individuals can benefit from the latest innovations.

In this blog post, we will highlight the most cutting-edge innovative trends utilized in commercial construction nowadays.

Also Read: How Can You Increase Productivity In Construction Work?

Automation

We need to look back 40 years into the past to completely understand the profound impact of automation.

The development of hydraulic and pneumatic devices in the middle to late 19th century was an exceptional breakthrough for our species. It resulted in the development of machinery such as earthmoving equipment and other tools that are now standard in our industry. Large-scale undertakings now take a great deal less time and effort because of these 19th-century innovations.

Imagine going back to the early 20th century, when automation started to exhibit more sophisticated functioning and capacities. Around this period, we began using cranes, power equipment, cherry pickers, and concrete mixers.

Internal combustion engines, such as forklifts, tractors, and bulldozers, replaced hand shovels, wheelbarrows, and working animals throughout this period

Computer-Aided Design (CAD)

During the peak of the middle ages, some of the most spectacular structures in the world were built by architects, draftsmen, master stonemasons, and builders employing advanced design and building techniques.

These strategies were unaltered for several centuries. However, the beginning of computer-aided design (CAD) in the second half of the 20th century fundamentally altered building designs.

Previously, with their two-dimensional plans and section drawings, architects and builders were limited by issues like distinct systems, electrical lines, and high-voltage alternating current ducting, contending for the same physical area.

Building Information Management (BIM)

Whether it’s an industrial or commercial construction project, building Information Management (BIM) enables architects, engineers, contractors, and subcontractors to collaborate on the intricate details of design and construction by using the same database and computer models. It has proven to be astonishingly versatile, while CAD significantly changed the role of designers.

As part of BIM, a detailed 3D model of the whole functional systems of a structure, such as pavement or curbs, beams and girders, HVAC and electrical installations, as well as the aesthetics of walls, arches, roofs, and railways, is created together by all project stakeholders.

BIM enables all preconstruction partakers to visualize and analyze design judgments and identify interferences and other errors before work is started on site because it is a collaborative process from beginning to end.

Sustainable Construction

Sustainability and renewable energy have become increasingly important forces across many businesses. Buildings powered by solar energy and energy-efficient designs make sure that property owners get the most out of their investments and have a good influence on the environment.

More eco-friendly construction practices are becoming popular as the construction sector explores strategies to lower carbon emissions. Utilizing eco-friendly building supplies like Cross-Laminated Timber, salvaged wood, bamboo, recycled rubber, and a long range of cutting-edge materials is one way to do this.

Smart Buildings

Using connected systems to create smart buildings is a key advancement in commercial construction. Companies provide a wide variety of automation features that guarantee a building’s connectivity. There are services like on-site communications, climate control, security, and access, among many more.

It gives property owners more control over the surroundings of their business facility. The owners can monitor any event that takes place in the building thanks to a regulated environment.

About Taurus Projects

Taurus Projects offers site construction services, mine site construction services, material management services, commercial fleet management services, commercial renovation services, earthworks construction services, commercial electrical services, and civil construction services. We offer straightforward solutions for your construction contracts.

Our staff, from head office to the field, have what it takes to ensure the jobs are completed on time, according to schedule, and within budget. We look forward to working for you. Contact us for more information.

How Do Construction Companies Manage Their Projects In Rainy Season?

How-Do-Construction-Companies-Manage-Their-Projects-In-Rainy-Season

Weather conditions can be inevitable and can be quite challenging for construction work. Especially the rainy season which can make it quite hard for construction workers to carry on with their project. The downpour can pose some serious threats and challenges during the process.

Rainy days are common in Canada; sometimes, it can rain for several hours non-stop with constant winds and storms. Rain causes a constant disturbance, forcing construction workers to stop the tasks at hand. In addition, if proper precautions are not taken, it can also end up damaging property and precious materials, and ultimately lead to a delay in the completion of the construction project.

Moreover, such a type of season can significantly impact the health of the workers, and thus fewer workers will be available to complete a construction project. This can further lead to delays in the construction project. However, a professional construction company is ready to combat any weather, as they have pre-planned everything to ensure the weather conditions do not lead to delays in the project.

Despite the rain, many companies manage to carry on with their construction work by following the helpful tips mentioned below in this blog post.

They Pre-plan

Obviously, people running a construction company are familiar with the weather conditions that might affect their construction project’s progress. Therefore well-established construction companies are proactive in pre-planning and always have a few tricks up their sleeves. This helps them manage their tasks despite poor weather conditions. They plan ahead for this and evaluate site-specific risks which may affect materials and equipment, and anticipate alternate construction plans before the rain happens. They identify any safety risks that may cause construction project delays and take proactive steps to continue the work under such circumstances.

They Use Waterproof Gear

Keeping your construction workers ready to combat such rainy conditions and providing them with the necessary safety equipment and waterproof gear is important to ensure that the construction project doesn’t stop.

Making them dress appropriately is the best way to fight against such weather. Protective items such as waterproof footwear, hand protection gear, raincoats, and other features such as slip-proof gear are important on rainy days. Moreover, the workers must wear goggles to protect themselves from the rainwater getting into their eyes during their work. They should wear slip-resistant boots that prevent slips and falls during their work.

A professional construction company makes sure that all its workers are safe and provides them with the necessary safety equipment and protective gear to keep themselves safe during this season.

They Take Special Care Of Live Wires

Open wires in the rain increase the chance of electrocution and are one of the biggest safety hazards on a construction site. Therefore, construction workers should be cautious of live wires and alert others of the electrical cables that may be lying on the ground.

They Train Their Workers To Move Cautiously

Asking your workers to finish the task at hand in haste during the rainy season only results in an increased risk of danger as doing the work hurriedly can increase the chances of slipping and falling. A well-established construction company makes sure that its workers are cautious, especially during the rainy season. They train their workers to take small steps and wear protective equipment and footwear to avoid slipping and falling.

Final Thoughts

You don’t need to worry about your construction project when you have hired a professional construction company to work on it, even in the rainy season. They have learned the proper training and have professional staff members with the necessary materials and protective equipment to work under such conditions.

About Taurus Projects

Taurus Projects keeps your construction projects under its strong supervision and ensures that it doesn’t get delayed in their completion. We are a top-rated construction contractor in Fort Saskatchewan.

We have been a major part of the Alberta and Western Canadian construction business landscape since 2006. Our company’s headquarters are located in Fort Saskatchewan, Alberta, and we have been providing quality construction services for more than 10 years. Taurus Projects offers site construction services, mine site construction services, material management services, and more. Our Staff, from head office to the field, have what it takes to ensure that all the jobs we take on are completed on time. Contact us for more information.

How Can You Improve Productivity On A Construction Site?

How-Can-You-Improve-Productivity-On-A-Construction-Site

Construction projects are tricky no matter how much time you spend on planning to build your new home or a commercial building. The plans may look good, but things can get pretty stressful when the tasks actually begin.

No matter how big or small a construction project is, lagging in terms of the schedule and going over budget are two things everyone goes through when things don’t go as planned.

The best and only way to avoid such scenarios is by hiring a certified construction management company. These accredited companies have trained construction contractors who know how to manage a construction project properly.

Also Read: 4 Qualities To Look For In A Commercial Construction Company

Everyone wants to increase their productivity on a construction site, but things like mismanagement of resources and falling behind the schedule affect the productivity of the construction project.

Now the question arises: how can you improve the productivity on your construction site without cutting corners? The answer to this is quite simple, don’t rush to complete work faster than the reasonable time and just make small optimizations to your whole process. If speed is your only concern, then the quality and safety of your project will suffer.

So by making small changes to how you manage tasks, materials, and people, you can boost the productivity on your construction site without sacrificing quality.

In this blog post, we will outline the top ways to help you improve your construction project’s quality and productivity.

Build Strong Communication

If you want your construction project to end on time and don’t want its quality to suffer, then you need to hire a construction contractor with profound communications skills.

A common mistake that most people make is trying to manage their construction projects themselves. Unfortunately, they don’t realize that as individuals with no prior experience, they can’t manage the whole construction project.

The only way you can improve communication at your construction site is by hiring a certified construction contractor with amazing communication skills.

Good communication with the whole construction crew plays a vital role in improving productivity. So make sure you hire someone who can be available to them 24/7 and make your project expectations clear to them right away.

It is impossible for you to meet your crew daily, so you must hire someone who can meet them daily to discuss the objectives and receive feedback on how things are going.

Also, always keep your construction contractor well informed on project needs and expectations, as no one can get a job done right if they don’t know what exactly is going on.

Moreover, when setting expectations, establish precise performance indicators for your whole crew, as this can be a great motivation tool, precisely when rewards are involved.

To help keep your construction project on schedule, keep reminding your construction contractor of what they are working towards. So strong communication is a great tool that will help you increase productivity on your construction site.

Plan Ahead

Another way you can improve productivity on your construction site is by planning everything ahead. In order to become more efficient on the construction site, you must take detailed planning seriously.

Forecast the needs of your construction projects from every aspect and plan accordingly, especially when it comes to the workforce, material, schedules, processes and other logistics.

The best way to manage all the logistics of your construction projects is by getting professional material management services from a certified construction management company.

When you are more organized at the beginning of the project, then ultimately, your construction project will go more smoothly.

You can start your construction project planning by asking questions like:

  • How is this construction project different from others?
  • What are my construction goals?
  • What milestones do I want to reach?
  • At what time do I want this project to be completed?

Also, make sure to set realistic goals that your construction crew understands. Moreover, remember that having smaller goals make a big project seem easier to accomplish.

In a construction project, time is money, and decision-making is the key. So you can improve the productivity of your construction projects by planning everything ahead of time.

About Taurus Projects

Taurus Projects is a reliable firm operating in Fort Saskatchewan and offering professional construction, materials management, and fleet management services.

We also offer a state-of-the-art maintenance facility in Fort Saskatchewan that can perform routine maintenance, repairs, and inspections on most types of Industrial, commercial, and highway equipment and vehicles.

We take pride in our top-notch services and pay special attention to the safety of our workers, the general public, and the environment. Contact Us now to get a hold of our trustworthy engineering services.

Top 5 Fleet Management Trends In 2022

Top-5-Fleet-Management-Trends-In-2022

Commercial fleet management involves numerous processes such as managing, organizing, controlling, and maintaining an organization’s fleet of vehicles.

The COVID-19 pandemic has brought many changes worldwide in many different industries and sectors, including fleet management processes. Most emerging trends in fleet management are fueled by companies wanting to enhance driver safety, minimize fleet management costs, and maximize operational efficiency.

A reliable fleet management company follows these trends and implements modern strategies to provide efficient services. Let’s explore the top five fleet management trends in 2022 and beyond.

Greater Adoption Of Electric Vehicles

The popularity of electric vehicles (EVs) has been on the rise for many years due to technological innovations and more focus on sustainability. With more significant technological improvements, it is highly expected that the adoption of EVs will increase in commercial fleet management.

Nevertheless, there are still some serious difficulties in this trend because it is costly for organizations to replace their existing EVs. Moreover, a significant improvement is required in the technology used in EVs, especially to cut down their charging time.

Also Read: 4 Benefits Of Construction Fleet Management

The Rise In Remote Fleet Management Technology

The remote fleet management technology concept was already popular before the global pandemic. However, its popularity has seen exponential growth during the pandemic because of the advancements in remote technology and wide-scale adoption.

There are many different mobile fleet management solutions available nowadays. Such platforms allow users to manage various aspects of their fleet of vehicles in a few simple steps from anywhere in the world. Managers can easily track important information and get critical alerts to respond to emergencies.

Better Security

Since modern vehicles and fleet management systems are heavily dependent on technology, making them as secure as possible is essential. More technology means the risk of cyber attacks is also greater.

Therefore, companies are focusing more on countering cyber threats by implementing state-of-the-art cyber security solutions. For instance, implementing GPS tracking devices in vehicles has helped reduce the risk of vehicle theft. It will also maximize the security of sensitive construction sites.

You should rely on professional fleet management services to access comprehensive fleet management capabilities that involve managing the fleet and documenting every detail, such as when a vehicle enters a specific area and leaves it.

Greater Usage Of Fleet Data And Analytics

Fleet tracking platforms are also helpful in enhancing vehicle and driver performance transparency. Gathering and analyzing data allows fleet managers to benefit from the affordable way of streamlining fleet management processes.

The good thing about modern fleet management data and analytics tools is that they also focus on providing route optimization services and monitor driver performance. You can also use predictive analytics to focus on critical areas of fleet management that are lacking.

Adoption Of 5G Technology

The introduction of 5G networks is paving the path for unprecedented progress in various industries, including fleet management. Since managing a fleet of vehicles depends on mobile devices and network connections, adopting 5G technology is highly useful in this industry.

The following are the major benefits of adopting 5G technology in fleet management:

  • Efficient Routing: 5G facilitates efficient routing, which means that fleet managers can easily alert their drivers about emergency situations and quickly re-route if required.
  • Better Communication: 5G technology makes networks more responsive and efficient, dramatically improving fleet-wide communication.
  • Enhanced Sensors: Better sensors mean the safety of the vehicles is greatly improved as the drivers are able to navigate the roads and avoid collisions. Moreover, even if an accident occurs, 911 can be called automatically.
  • Better Maintenance: Since 5G is all about speeding up the network and critical processes, it also improves vehicle maintenance by providing real-time diagnostics reports of vehicle parts and software.
  • Better Vehicle-to-Vehicle Connectivity: Real-time vehicle-to-vehicle communication can reduce the number and severity of crashes.

About Taurus Projects

Taurus Projects offers professional fleet management services for all types of organizations and industries. Companies with large industrial equipment, highway vehicles, and commercial fleet vehicles can rely on us to get professional services that follow the modern trends of fleet management.

You can contact us anytime if you have any questions or want more information about our fleet management services.

The Significance Of The Design Phase During Pre-Construction

The-Significance-Of-The-Design-Phase-During-Pre-Construction

Every construction project has a set of crucial processes or phases that must be completed in order for it to be successful, and skipping any of them could cause problems later on. Pre-construction is a concept that encompasses a variety of various elements, one of them is construction design.

Planning is the foundation of all successful projects, whether it’s construction, marketing, or even the start-up of a new company. For commercial or residential building construction, the design phase is crucial because you want to make sure that every choice maximizes your investment. Giving the design phase additional attention at the start of a project will help you resolve any issues you may encounter later.

To understand more about the value of the design phase in building construction, keep reading our blog post!

Also Read: Frequently Asked Questions About The Design-Build Process

Clear Coordination

A contractor should have a level of experience that the client feels comfortable with, including the design component of this equation. Although the contractor has experience in the design field, the client is the one with the vision. So collaboration increases the likelihood of success.

The client feels the risk of being let down if they just give this responsibility to the contractor, but on the other end of the spectrum, not comprehending the costs involved could lead to financial disaster. A project’s completion can be ensured through a collaborative process that combines the clients’ ideas with the contractor’s experience and expertise.

Planning

Planning is the first step in any successful project. The first step in the design process is a meeting with the pivotal decision-makers and creative professionals on the general contractor team to go through the project’s vision, logistics, and outcomes.

A final deliverable should be the outcome of a collaborative process that explores choices and directions. The team will go over the project’s architectural, physical, and financial needs as well as the code requirements.

Eliminating Potential Issues

Given that there will be inevitable changes during the construction process, flexibility in design and construction is a benefit. Dealing with this issue in advance creates a much more amicable situation because it may become a much more expensive task to attempt and change direction once the groundwork has started and things are in motion.

The initial construction design is often just a starting point for discovering potential problems. Before any work is started, it’s possible that the chance of a business expanding may necessitate a larger footprint than initially estimated or that the HVAC or other technical requirements will need to be adjusted.

Checking All The Boxes

The design phase also helps contractors to check all boxes before moving with the help of Mango onto the groundwork. The frustration of unexpectedly shifting gears or coming to a halt can be avoided by being aware of exactly what legal issues or site-specific concerns need to be addressed. This is a time-waster and may result in expensive restorations if something goes wrong.

Your commercial general contractors should also take care of permitting, another crucial stage, on your behalf. It’s crucial to make sure the necessary permits are secured, not only to preserve property value and assure code compliance but also to ultimately save you money. Once the last thing has been taken care of, having this experience beforehand can ensure that there are no unpleasant surprises.

Financials

Budgeting and financial models play a significant role in the pre-construction and design phases. During the pre-construction stage, conceptual expenditures are frequently developed, and as a design is improved, accurate cost estimates are updated.

Any subcontractors and suppliers should deliver construction cost estimates, logistics details, and schedules.

About Taurus Projects

Taurus Projects offers site construction services, mine site construction services, material management services, commercial fleet management services, commercial renovation services, earthworks construction services, commercial electrical services, and civil construction services. We offer straightforward solutions for your construction contracts.

The four divisions of Taurus complement and support each other perfectly, enabling us to offer a full range of products and services. Our Staff, from head office to the field, have what it takes to ensure that all jobs are completed on time, according to schedule, and are within budget. We look forward to working for you. Contact us for more information.

Helpful Tips For Construction Managers

Helpful-Tips-For-Construction-Managers

Architects, construction managers, and contractors are individuals that put in countless hours to convert ambitious plans into a reality and give back to society in many ways. They are the ones who look after and manage your commercial and industrial construction works.

The task of coordinating and controlling construction projects from inception to completion is handled by construction project managers. They are responsible for ensuring that construction projects are completed on schedule and within budget.

The specific duties of a construction project manager vary depending on the company, but they typically include managing the budget, collaborating with owners, architects, and engineers, hiring subcontractors, scheduling and planning work, and making sure materials and equipment arrive at the project site on time.

A particular set of abilities and commitment to how a project is managed makes the difference between a construction manager and a successful and effective construction manager.

In this blog post, we will cover the main competencies needed for effective construction management along with tips on how to manage construction projects successfully.

Also Read: Common Uncertainties Construction Project Managers Face

Choose Construction-Specific Tools

It’s no secret that WhatsApp and Excel are the go-to tools for everyone in the construction sector and we understand why. They are both excellent tools that can greatly simplify your daily tasks and let you connect with a variety of people in a few clicks.

However, they are insufficient for managing a construction project. The reason for this is straightforward. They are unable to link the planning to the site updates that you receive. Therefore it is recommended that you use the construction-specific tools specially designed to cater to management needs.

Managers can get a shareable on-site live view of your project and stay up to date with each team’s work at every stage by utilizing a construction-specific tool. That could ultimately help them save both time and money.

Plan Ahead

Planning ahead is one of the most effective strategies for successfully managing a construction project. Managers of construction projects should have the insights to foresee what will be required and how to address problems that are likely to develop.

High levels of attention to detail are necessary for effective project management. To completely evaluate project plans and specifications and fully comprehend the required scope of work, this competence is very crucial.

Construction project managers can identify the kinds of resources such as supplies, machinery, equipment, and labor needed to carry out a project thanks to this comprehensive evaluation.

Learn To Communicate

Probably the most crucial skill a construction project manager needs to have is the ability to communicate clearly. Both written and verbal communication skills are essential for a successful construction project manager. All messages must be concise and straightforward.

You may only need to send a quick email or text in some situations, but other times you may need to pick up the phone or arrange a brief in-person meeting. Establish a chain of command for the information sharing process and a communication plan to decide what channels of communication should be used for various situations.

Make Safety A Priority

We cannot emphasize this point enough. Regardless of the nature or scope of your project, safety should always come first. Nothing is more essential than human life, and project managers are well aware of this.

The well-being of your team should be of the utmost priority whether it is site safety or stress management to enable construction workers to be content and, consequently, productive.

By putting a priority on safety, you can guarantee that serious accidents won’t happen and that most activities will get done more quickly. This can enable the project managers and team more room to breathe and work much more productively.

Manage Your Time Wisely

Project managers have a lot to do with planning, developing, coordinating, managing, and reviewing. New issues arise more frequently in construction projects because they are continuously changing.

To succeed in your work and oversee the effective completion of a project, you must possess strong time management, prioritization, and delegating abilities. To coordinate and arrange duties most logically and effectively possible, use your team as a resource.

About Taurus Projects

Taurus Projects offers site construction services, mine site construction services, material management services, commercial fleet management services, commercial renovation services, earthworks construction services, commercial electrical services, and civil construction services. We offer straightforward solutions for your construction contracts.

The four divisions of Taurus complement and support each other perfectly, enabling us to offer a full range of products and services. Our staff, from head office to the field, have what it takes to ensure that jobs are completed on time, according to schedule, and are within budget. We look forward to working for you. Contact us for more information.

How To Avoid Delays In A Construction Projects Schedule

How-To-Avoid-Delays-In-A-Construction-Projects-Schedule

A construction project should be started and completed according to its schedule. You can meet the scheduled deadlines only if you start and end all phases of the project at the given time. However, without a proper plan it can be difficult to meet the deadlines of your project.

A detailed construction project plan will not only help you complete the project phases on time but will also help you maintain the sequence of activities of your project.

Though there are many factors that can affect the deadlines of your project, hiring a certified construction company can help you complete the project on time.

Generally, project managers align all tasks and their resources in their project plan. But, a small delay in a single task can delay the completion of the entire project. Of course, there could be many reasons for a delay such as poor management, poor planning, lack of resources, sudden changes, weather conditions, legal disputes etc.

No doubt it is very disappointing for the entire team to face a delay in the completion of a project on which they have worked hard with their full devotion. Hence, this blog will further discuss some practical ways to avoid delays in the completion of a project.

Comprehensive Planning

A detailed plan should be developed that enlists all construction activities. Moreover, a schedule should be added to the plan to describe the sequence of which activities will be performed. It is best to assign roles to the schedule to make sure every team member is aware of the responsibilities and roles assigned to them.

To overcome delays, the project plan should contain a flexible schedule which has enough extra time for all tasks. This is an important step to avoid any delays in the start time of an activity due to a delay of another activity.

To complete the project on time you should get professional construction management services from a certified construction company. A certified construction contractor will make sure that all policies and protocols are followed by all team members.

The project plan should include details about the outsourced activities and contractors who are supposed to provide constructional resources.

Also Read: Top Construction Project Scheduling Techniques

Assign Responsibilities

To ensure timely project completion construction contractors, laborers and other team members should know their responsibilities. Notably, everyone should understand their role in the construction process.

Due to the sense of responsibility, team members will try their best to be on the right track and meet their deadlines. So they do not become a reason for the delay in the construction project.

Activity Tracking

Construction management plays an important role in motivating a construction team and letting them complete every step within their given deadline. However, managers should keep track of the activities being performed by construction engineers and laborers, to analyze the performance of their team.

The activity tracking results describe if the tasks are getting completed according to the schedule or if a task can be a cause of delay at the beginning of another task.

To successfully track everything the activity schedule should be checked to see the predecessor and successor activities of that particular construction step.

Good Communication

Communication is necessary for teamwork because lack of communication will only increase ambiguities and cause issues in the working process. Although it is difficult to have good communication with the complete construction team as there are too many people involved in a construction project. It is important to build strong communication between team members, construction contractors and engineers.

Therefore, managers should conduct meetings to discuss any confusion and hurdles as due to such practices they can then overcome any issues and the work can then continue smoothly and meet the project’s deadlines.

About Taurus Projects

Taurus Projects provides construction services for commercial and residential construction projects. We aim to provide a safe working environment for our employees, labours and everyone in the workforce. We understand the importance of a safe construction site for our clients. Our professional team provides reliable construction. If you need construction services contact us today.