Even though materials make up a significant portion of construction expenditures, the management of materials appears to be improvised rather than methodical. Problems with their inventory and onsite material management are among the many difficulties workers encounter in the construction sector.
For the majority of businesses in the construction sector, material management has been a significant issue for many years. Construction companies frequently mismanage the materials used in construction project operations. The scope of tasks related to materials management grows along with the contract’s magnitude.
Effective materials management can be achieved by acquiring the assistance of reliable construction contractors.
Here are some reasons why effective material management in construction is important.
Increased Worker Productivity
In the construction sector, labour costs are frequently the focus of cost-cutting initiatives. Often, maximizing labour hours is the most effective strategy to accomplish these cost savings. However, employee productivity is frequently disregarded as a means of controlling expenditures. Utilizing a digital solution would guarantee efficient material management, which can greatly increase worker productivity.
To achieve their goals, a construction crew requires the appropriate materials at the appropriate time. They are less productive and more likely to experience project delays or incur extra charges the longer they wait for equipment and materials to arrive or to find them on the building site.
Having professional construction contractors with material management skills to handle the supplies and inventories will allow you to have a workforce that is best for your company.
Also read: Essential Tips to Streamline Construction Material Management
Reduce Or Eliminate The Handling Of Goods Twice
Material handling, which frequently consumes up to 40% of a team’s time on a construction site, is another factor in lower labour productivity and related expenses. Tools for effective scheduling, tracking, and communication are part of a strong material management system. These allow items to be dumped and kept in the most advantageous area while also preparing locations for the materials.
Deliveries of materials should ideally be planned so that the proper personnel are there to accept and inspect them, using a bar-code scanner to feed them into the digital platform. By avoiding unnecessary duplicate handling, better outcomes can be obtained while also saving time.
Having efficient construction contractors is an exemplary way to start.
Reduced Material Wastage
Digitalization in material management ensures that the proper materials are obtained in the first place and that they arrive at the right time and location.
Buying the incorrect building supplies can result in a range of issues, from short delays to safety dangers. If the wrong materials are used, project deadlines may be missed, or contract penalties may be imposed if the project’s specifications or code are not met.
Similarly to this, scarcity of the necessary materials may increase expenses and cause building delays while workers look for or await more to be delivered. The cost of ordering extra goods in smaller amounts often increases since they are more expensive per unit than bulk supplies.
The substitution of inferior materials by workers could result in safety problems or contract penalties for failing to meet project criteria.
On the other hand, too much goods will result in material waste. Due to the money spent on unnecessary supplies and the related storage and disposal charges, this is expensive for projects.
Additionally, material waste can result from degradation while being stored, whether as a result of poor storage conditions or from being delivered too soon and going bad before being used. Digitization may be a surefire approach to eliminate material waste.
Improved Budget Accuracy And Forecasting
Material and workforce make up a significant portion of construction project costs, even when things are running smoothly. But when problems occur, these costs can explode due to decreased productivity and project delays.
A comprehensive material management strategy, with real-time data visibility and accurate reporting, can help to prevent these problems.
This ultimately leads to more accurate budgets and forecasting. Having a more accurate understanding of the existing inventory and future needs will lead to more accurate budget forecasts when changes or updates are required, improving the confidence of executive management in the project goals which need to be accomplished.
Adherence To Project Milestones And Deadlines
The workforce will be able to complete their tasks on time if they have access to what they need when and where they need it. The entire project will remain on schedule, ultimately meeting milestones and deadlines and, most crucially, avoid financial penalties for missing these goals.
When it comes to meeting milestones and deadlines, real-time visibility of what’s happening across all of the sites and accurate, regular reporting is essential. This is only possible if the team leaders and managers, both on-site and in the head office, are given digital tools to monitor the progress of the project.